← All opportunitiesAlpha 3 Sprint C · financial and equipment intelligence
Qualified · Regina branch

New café opening package

Lakeside Café · Moose Jaw, SK

CaféAngela Marchuk5 days in stage
AI opportunity79Review
Data noticeAutoQuotes and CRM opportunity integrations are not connected. Records shown are read-only demonstration opportunities for workflow validation.
AI sales copilot

Collect final menu and service volumes

Equipment selection should be validated against the final menu.

Potential additional GP$0Modeled, not guaranteed
Opportunity value$97,500
Estimated EBITDA$16,08416.5% of revenue
Margin vs target24.0% / 26.0%
Contribution score57Review
Sprint B

Financial intelligence

Gross margin is 2.0 points below target. Review pricing and project expenses before making further concessions.

View JSON
RevenueDemonstration
$97,500

Opportunity selling value from the DensonOS demonstration record.

Equipment costDemonstration
$74,100

Estimated equipment cost before project expenses.

Gross profitModeled
$23,400

Revenue less estimated equipment cost.

FreightModeled
$2,828

Industry-based freight allowance; supplier quotes are not connected.

InstallationModeled
$2,633

Modeled installation and site-work allowance.

CommissionModeled
$1,076

Modeled commission impact applied to estimated gross profit.

Warranty reserveModeled
$780

Modeled reserve for warranty and execution exposure.

Estimated EBITDA contributionModeled
$16,084

Gross profit less modeled freight, installation, commission and warranty reserve. This is not accounting EBITDA.

Contribution score57Review

Measures margin quality, readiness, close probability and modeled EBITDA contribution.

Comparable Café margin
24.0%Current
26.2%Average
29.3%Top quartile

2.2 points below comparable average

Sprint C

Equipment knowledge engine

2 required equipment dependencies need review before the package is considered complete.

View JSON
Denson knowledge score59Review6/8 required · 1/5 recommended complete
Modeled GP opportunity+$6,550Incomplete accessories, service and consumables

Required dependencies

Missing
Water filtrationAir-cooled cuber with storage bin · Performance

Filtration improves ice quality and reduces scale.

Omission risk: Scale, poor taste and shortened equipment life.
Complete
Machine and bin drainsAir-cooled cuber with storage bin · Installation

Separate gravity drainage may be required for machine and bin.

Complete
Bin or dispenser compatibilityAir-cooled cuber with storage bin · Installation

The ice head, adapter and storage component must be compatible.

Complete
Airflow and ambient conditionsAir-cooled cuber with storage bin · Performance

Air-cooled machines need sufficient ventilation and suitable room temperature.

Complete
Dedicated electrical serviceUndercounter refrigerator · Installation

Correct voltage and dedicated circuits support reliable operation.

Complete
Condenser airflow and clearanceUndercounter refrigerator · Performance

Condensers require airflow to reject heat efficiently.

Missing
Ambient temperature verifiedUndercounter refrigerator · Performance

Hot kitchens and confined spaces can exceed equipment ratings.

Omission risk: Temperature failure and compressor stress.
Complete
Door swing and access verifiedUndercounter refrigerator · Installation

Door orientation and delivery access must suit the site.

Recommended revenue and lifecycle items

Review
Opening cleaning and sanitation kitAir-cooled cuber with storage bin · 89% confidence

Ice-contact surfaces require regular cleaning and sanitizing.

Modeled GP opportunity: +$650
Review
Preventative maintenance agreementAir-cooled cuber with storage bin · 89% confidence

Routine descaling and inspection protect production capacity.

Modeled GP opportunity: +$2,200
Review
Casters or seismic restraintsUndercounter refrigerator · 89% confidence

Mobility or restraint requirements should match cleaning and code needs.

Modeled GP opportunity: +$700
Complete
Additional shelving and pan slidesUndercounter refrigerator · 89% confidence

Storage accessories improve capacity and fit the customer workflow.

Review
Condenser maintenance planUndercounter refrigerator · 89% confidence

Coil cleaning protects efficiency and compressor life.

Modeled GP opportunity: +$1,800
EBITDA improvement

Improvement opportunities

Modeled potential+$1,950
Review onlyRecover target margin

Review discounts, omitted accessories and scope allowances before offering further concessions.

91% confidence · +$1,950 modeled EBITDA impact
Financial risk engine

Risk review

Moderate
Margin below target

Current gross margin is below the opportunity target and should be reviewed before further concessions.

24.0% vs 26.0% target
High
Incomplete quote scope

Missing quote components increase the chance of unplanned costs or change orders.

68% readiness
Next best actions

AI recommendations

Review only
CompletenessCollect final menu and service volumes

Equipment selection should be validated against the final menu.

96% confidence
Quote quality

Opportunity readiness

68%complete
Menu and volumeReview · Final menu has not been approved.
Coffee equipmentComplete · Primary coffee package is represented.
Water filtrationMissing · Filtration should be added for beverage equipment.
Smallwares opening packageMissing · Opening smallwares have not been scoped.
Profitability

Margin health

Current margin24.0%
Target: 26.0% · Management review recommended
Margin variance-2.0%
EBITDA margin16.5%
Cross-branch intelligence

Pricing consistency

95%Consistent

Demonstration score comparing branch pricing patterns. No pricing is changed automatically.

Assigned branchRegina
Assigned salespersonAngela Marchuk
Trust and governance

Financial assumptions

Modeled · read only
  • Values are demonstration estimates and are not sourced from QuickBooks, AutoQuotes or Cin7 actual cost records.
  • Freight, installation, commission and warranty reserve use industry-based modeling assumptions.
  • Estimated EBITDA contribution is a project contribution estimate, not corporate accounting EBITDA.
Engagement history

Activity timeline

View JSON
Proposal follow-upEmail

Proposal status reviewed; no source-system action was taken.

Pricing package preparedQuote

Demonstration pricing package recorded for workflow validation.

Needs reviewMeeting

Customer requirements, installation dependencies and timing were discussed.